The City of Metchosin Bylaw for the Protection and Management of Rain Water regulates the use and development of land to minimize the impact on a watershed by emphasizing the conservation and balance of water in and over the land.
The performance requirement is to address 90% of rainfall on-site. A minimum depth of 300 mm of topsoil is required for lawn and other landscaped areas is required.